Central Heating | Case Study | Zing Energy

First Time Central Heating

The Project

LocationWalsall
DateJanuary 2020
Project typeResidential
MeasureFirst Time Central Heating

THE CHALLENGE

Mr Cooper was spending a lot of money on his energy bills as the only heating he had at the premises was electric room heaters. He had a gas meter at the property, but full central heating systems are expensive and he could not afford the upfront costs. 

The solution

We were able to offer Mr Cooper a full gas central heating system that would heat 100% of his home that included a full set of heating controls including a programmer, room thermostat and thermostatic radiator valves (TRVs). We carried out extensive heat loss calculations, room by room to adequately heat the home with the correctly sized radiators and installed a Worcester Greenstar 30i ERP that comes with a 2 year warranty as standard and a 12 month workmanship warranty. This saves Mr Cooper around 15% of his fuel bills. As an added bonus, we also treated his home with Cavity Wall Insulation and Loft Insulation to keep that heat in; further reducing energy bills and increasing the comfort of living in the home.

The results

  • Reduced heat loss through the walls
  • Reduced heat loss through the roof
  • Reduced fuel bills
  • Reduced carbon footprint
  • Improved energy efficiency
  • Improved property value
  • Improved standard of living
  • Increased control of expenditure

Talk about a whole house makeover!

Zing Energy recently installed a boiler and radiators in my house as well as insulating my walls and loft – talk about a whole house makeover! I was very impressed with their standard of workmanship and I am so pleased with my new boiler. I and very happy to recommend this company to anyone looking for similar improvements.

View all testimonials

Step 1 of 3

Emily and James creative